COMPLETED WORK 2014
Edington Priory (2 manual, 26 stops)
We were commissioned to build a new organ for this lovely church with its celebrated annual Festival of Music within the Liturgy.
Design
Jan 2012
![]() East elevation | ![]() North elevation | ![]() Plan | |
![]() north elevation | ![]() Looking out through the Swell shutters to the Great | ||
Console
Console
![]() Stops from the ‘new’ organ | ![]() Key shelf | ![]() Manuals | |
![]() New pedalboard | |||
![]() Toe piston |
Casework
Casework
Soundboard & Chests
Soundboards & Chests
![]() Leathering assistor motors for soundboard action | |||
![]() Swell soundboard grid | ![]() Soundboard components | ![]() Assembling the soundboard | |
Pipework
Pipework/Metalwork
![]() New Pedal 16′ Trombone basses |
Wind System
Wind System
![]() Leathering Great reservoir | |||
![]() Completed Swell Rollerboard | |||
The organ before & after
The New Edington Priory Organ
![]() The new organ looking north east (photo by Andrew Crisp) | ||||
![]() The old organ looking north |
Completed photos of the Edington Priory organ
Photos taken by Andrew Scott (except where stated)
Hammersmith, St Paul’s Girls’ School
Grant, Degens & Bradbeer 1970: Overhaul, install electric stop action and new blower.
Below are a series of images showing the progression of work from old to new
Soundboard, Actions & Chests
Soundboards, Actions and Chests
Soundboards overhauled, repaired and cleaned. Drawstop actions replaced with slider solenoids.
Console
Console
The console was given a full overhaul and damaged parts replaced or made good.
Pre-work
![]() | ![]() | |
May 2014
![]() pedalboard | |||
June – Sept 2014
![]() Stops panel | |||
Swell
Swell
The shutter front was checked and re-felted
Wind System
Wind System
Full overhaul of wind system. Re-leathering of double-rise reservoir, new lever magnets installed
Pre-work
September 2014
Pipework
Pipework
All pipework and reed stops were repaired where necessary and cleaned.
New front pipes to match those in the towers to rise behind the pipe shades. Front pipes were painted.
Pre-work
June – Sept 2014
October 2014
![]() Swell Reeds | |||
Misc
Electrics
The electrical system has been replaced. Low voltage cabling provided.
Casework
Lower access doors repaired.