LEIGHTON BUZZARD, ALL SAINTS’ CHURCH

 

All Saints’, Leighton Buzzard

H&H 1989, 3 manual 38 stops.

Clean and overhaul including revisions to actions and pipework.  Start April 2018

 

Dismantling

 

Pipework

Pipework cleaned, tongues reset and wedges tightened.

 

Console

Console cleaned and adjusted.  Foot pistons revised to reduce noise.  Keyboard frames and rear pin rails strengthened and swell Pedal mechanism overhauled.

Soundboards and Actions

Work on the pallets and slide seals where required.  Assistor motors to be releathered. 

Operation of the actions to be revised. Gearing of the coupling to be revised. Actions set up and adjusted.

Wind system

Wind system to be cleaned and tremulant primary to be enclosed.

shutters